Revitalizing the lab building

The laboratory is installed in a building reportedly erected to build and service airships (Zeppelin).
The arching structure made of reinforced concrete was preserved. Today, the development of future technologies is performed in a building with great history.

Demolition and Restoration

Demolition of fixtures – February 2015
Demolition of facade levels – April 2015

Rebuilding

Shell construction work – June / July 2016

Installation of Test Equipment

Module installation 1st floor – May 2017
Module installation ground floor – August & October 2017
Control room of the test bench level
Technical Building Equipment level of the test modules
2nd test bench level – 1st floor

Renewed Building

Facade design Franz-Grill-Straße – east view
(Photo by Klaus Ranger Fotografie)
Facade design Franz-Grill-Straße – south-east view